Prepare a twelve to fifteen (12-15) slide presentation: Project charters, and Work Breakdown Structure

Are you stressed by poor grades and tight deadlines? We have your back. We can do this or a different assignment for you at an affordable price. Use customdissertations.org writing services to score better and meet your deadlines.


Order a Similar Paper Order a Different Paper

Prepare a twelve to fifteen (12-15) slide presentation in which you:

  1. Identify the project objectives, and conclude how the project team has met each of the identified objectives.
  2. Discuss how having a project charter contributed to the success of your project.
  3. Identify the stakeholders, and describe how stakeholders’ analysis has assisted in a smooth management of the project.
  4. Analyze the Work Breakdown Structure (WBS) created, along with the explanation for each task.
  5. Present the project plan / network created, and make sure that critical path is properly depicted.
  6. Describe the techniques of reducing project duration, and describe if any such techniques are used for your project.
  7. Describe the project communication plan used for the project.
  8. Describe the main assumptions and exclusions (taken from scope
    statement), dependencies, or any other major issues of the project.
    Explain how they have been handled.
  9. Distinguish the scope, time, and cost constraints.
  10. Compile a list of six (6) best practices arising from this project’s lessons learned.
  11. Recommend methods to avoid similar obstacles in future projects.
  12. Compose a list of next steps with the assumption that there is a need to create another phase for this project.
  13. Format your assignment according to the following formatting requirements:
    1. Use the PowerPoint presentation template that
      can be found in the online course shell. Your professor will inform you
      if the template can be modified. If you need more than the maximum
      allotted number of slides for your presentation, contact your professor
      for the approval.
    2. Include a Title Slide which contains the title of the assignment,
      the student’s name, the professor’s name, the course title, and the
      date. The Reference Slide must follow APA format. A minimum of three (3)
      references are required. The Title Slide and Reference Slide are not
      included in the required page length.
    3. Create Speaker Notes to accompany each slide that emphasize and
      embellish the key points to the stakeholders. Please be clear and
      thorough as if you are actually presenting.

assignment_1project_planning_avon.doc
assignment_1project_planning_avon.doc
assignment_2.doc
execution__control__and_closure________________________________________________________________.doc

We offer CUSTOM-WRITTEN, CONFIDENTIAL, ORIGINAL, and PRIVATE writing services. Kindly click on the ORDER NOW button to receive an A++ paper from our masters- and PhD writers.

Get a 10% discount on your order using the following coupon code SAVE10


Order a Similar Paper Order a Different Paper